Logout
Click here for Pulp & Paper Radio International
The Paperitalo Library
Free Downloads
Search
My Profile
Login
Metsä Board to install core handling and roll handling systems at Husum Mill
Comment Print

Core Link has been awarded a combined contract by Metsä Board for new Core Handling and Roll Handling systems, to ensure the planned production capacity increase on BM1 at the Metsä Board Husum Mill.

Andreas Bjernklev, Head of Sales & Projects at Core Link, said: "The planned Capacity increase from 400,000 to 600,000 tons/year will create some interesting challenges for the Roll- and Core Handling systems at the Husum Mill."

The Core Handling delivery includes; a High Capacity CL4090 Core Cutter with Twin Parent Core Robots and a Parent Core Transport System also feeding an existing Core Link Core Cutter.

Core Link will also deliver Automatic Core Plugging and Core Transport Systems to two winders.

The Roll Handling delivery includes; a rebuild of existing Roll Handling System to increase and optimize capacity and throughput, a new Roll Handling line from new winder to existing Roll Handling system, an intermediate automatic roll storage system and Core Links automatic trailer loading system "Loadmate".

The machine installation will be carried out from 4Q 2022 and throughout 2023.

Metsä Board is a leading European producer of premium fresh fibre paperboards and forerunner in sustainability. Metsä Board is part of Metsä Group.

Core Link is a market leader with deep process knowledge and technical know-how in material handling for the paper-, plastic-, metal- and converting industries. Core Link is a part of the Mustad United Group.

Readers, please tell your suppliers that you read Paperitalo Publications

 


Powered by Bondware
News Publishing Software

The browser you are using is outdated!

You may not be getting all you can out of your browsing experience
and may be open to security risks!

Consider upgrading to the latest version of your browser or choose on below: